5 Putting into operation
44
B-90
Operation Manual, Version B
j
Feed tubing
k
Spray cap
NOTE
• Only use original BUCHI parts for installation.
• Small parts (
e
–
j
) are available in the set „Set of feed tubing connections complete“ with
order no. 051768.
Assembly steps
1. Put the “Silicone seal”
g
onto the two
“Fittings”
f
and screw them into the head
holder hand-tight.
2. Introduce the “Rubber sealing”
c
onto the
head holder.
3. Mount the spray head at the “Head holder”
d
. See also section 5.3.2 for details.
4. Insert the electrical cable through the cable
hole of the “Head holder”.
Содержание Nano B-90
Страница 1: ...093261 en Nano Operation Manual Spray Dryer B 90...
Страница 2: ......
Страница 101: ...11 Declarations and requirements 101 B 90 Operation Manual Version B 11 2 Declaration of conformity...
Страница 102: ......
Страница 103: ......