5 Putting into operation
37
B-90
Operation Manual, Version B
5.3
Sub-assembly installations
Switch off the instrument and remove the power cord before any installation work.
5.3.1
Lifting device
a
b
a
Position the lifting device, using the three bottom
sided timing holes, onto the matching knobs at the
instrument’s basement.
b
Rotate the lifting device some degrees clockwise to
fix it tightly by hand. The lever has to be positioned
towards the front.
d
e
c
70 mm
c
Screw the gas outlet part onto the lifting device with
two hex-wrench screws.
d
Take the small o-ring from the set of sealings (order
no. 051775). Place it on the sealing seat of the gas
outlet part.
e
Install the outlet temperature sensor at the gas
outlet part. For the correct installation depth keep
the sensor housing approximately 70 mm out of the
gas outlet part. Use a flat spanner to fix the screw
fitting of the sensor housing tightly
Subsequently connect the outlet temperature sensor
plug to socket (see section 4.10, socket
b
).
Содержание Nano B-90
Страница 1: ...093261 en Nano Operation Manual Spray Dryer B 90...
Страница 2: ......
Страница 101: ...11 Declarations and requirements 101 B 90 Operation Manual Version B 11 2 Declaration of conformity...
Страница 102: ......
Страница 103: ......