5 Putting into operation
39
B-90
Operation Manual, Version B
e
Use the protective grid holder to carefully
insert the HV-electrode into its seat at the
bottom plate of the particle collector. Clean
and dry this part before installation.
f
To unlock the protective grid, open the
spring lock at the handling knob first.
Carefully lift off the grid from the HV-
electrode in a vertical upwards movement.
Finally, connect the electrical cable of the
particle collector to the high voltage socket
at the frontside of the instrument (see section
4.10, socket
a
) and fix it hand-tight.
Содержание Nano B-90
Страница 1: ...093261 en Nano Operation Manual Spray Dryer B 90...
Страница 2: ......
Страница 101: ...11 Declarations and requirements 101 B 90 Operation Manual Version B 11 2 Declaration of conformity...
Страница 102: ......
Страница 103: ......