5 Putting into operation
34
B-90
Operation Manual, Version B
5
Putting into operation
This chapter describes how the instrument has to be installed. It also gives instructions for the initial
startup.
NOTE
Inspect the instrument for damages during unpacking. If necessary, prepare a status report imme-
diately to inform the postal company, railway company or transportation company. Keep the original
packaging for future transportation.
5.1
Installation site
Put the instrument on a stable, horizontal surface. Consider the maximum product dimensions
and weight. Installation on a mobile trolley is also possible. Obtain the environmental conditions as
described in section 3.2, technical data.
NOTE
T o cut the power in case of an emergency by unplugging, the instruments or any other items must
not block the mains plug!
!
Warning
Death or serious injuries by use in explosive environments.
• Do not operate the instrument in explosive environments
• Do not operate the instrument with explosive gas mixtures
• Before operation, check all gas connections for correct installation
• Directly withdraw released gases and gaseous substances by sufficient ventilation
!
Caution
Risk of minor or moderate injury by heavy weight of the instrument.
• Consult a second person to transport the instrument
• Do not drop the instrument
• Place the instrument on a stable, even and vibration-free surface
• Keep limbs out of crushing zone
Содержание Nano B-90
Страница 1: ...093261 en Nano Operation Manual Spray Dryer B 90...
Страница 2: ......
Страница 101: ...11 Declarations and requirements 101 B 90 Operation Manual Version B 11 2 Declaration of conformity...
Страница 102: ......
Страница 103: ......