Büchi Labortechnik AG
Operating top-mount drying racks | 8
Operation Manual Lyovapor™ L-200/L-200 Pro
79/100
8.5
Operating acrylic drying chamber (on-heatable shelf)
u
Make sure that the groove above the ice
condenser is clean, free of dust and not
scratched.
u
Check the 300 mm dia. O-ring for damage.
u
Place the 300 mm dia. O-ring in the groove
above the ice condenser.
u
Place the intermediate plate on the ice
condenser.
u
Place the rack on the intermediate plate.
u
Locate the cylinder in the groove above the
main plate.