Büchi Labortechnik AG
Operating Pro control panel | 7
Operation Manual Lyovapor™ L-200/L-200 Pro
53/100
Reconditioning
The instrument is restarting after a tem-
porary power failure (< 15 min).
Warming up pump
The vacuum pump is being brought up to
operating temperature.
Vacuum Test
The instrument is performing a vacuum
test.
Leak Test
The instrument is performing a leak test.
Manual Drying
The instrument is in the course of a man-
ual freeze-drying process.
Recovering
The system is in the process of recovering
from a power failure (> 15 min).
The current parameters of the freeze-
drying process are being re-established.
Hold
The instrument is in the holding phase.
Primary drying
The instrument is in the primary drying
phase.
Secondary drying
The instrument is in the secondary drying
phase.
Tempering shelves
The instrument is modulating the heat-
able shelves to the set temperature.
Stoppering
The instrument is ready for stoppering.
Symbols on the status bar
Symbol
Status
The instrument is defrosting.
The instrument is in energy-saving mode.
The instrument is in the course of a freeze-drying
process using a method.
The instrument is starting up.
The instrument is in the course of a manual
freeze-drying process.
The instrument is connected to the BUCHI Cloud.
P
Sample protection is active.
Reason: the pressure is outside the pressure lim-
its.
T
Sample protection is active.
Reason: the temperature is outside the safe tem-
perature range.