Büchi Labortechnik AG
Operating top-mount drying racks | 8
Operation Manual Lyovapor™ L-200/L-200 Pro
69/100
8
Operating top-mount drying racks
8.1
Operating stoppering acrylic drying chamber
u
Make sure that the groove above the ice
condenser is clean, free of dust and not
scratched.
u
Check the 300 mm dia. O-ring for damage.
u
Place the 300 mm dia. O-ring in the groove
above the ice condenser.
u
Locate the springs in the holes on the ice
condenser.
u
Place the intermediate plate on the ice
condenser.
u
Loosen all fixing screws.