Bruker Daltonik GmbH
Operation
5. Pull out the target out from the target slide.
Caution:
Take care not to drop anything into the load port. Doing so can
prevent proper operation.
6. Place new target on the target slide and shift it into the load port until the end
position.
7. Push up the lever until the cartridge cover is closed. Then push down the lever
and lock it into its end-position.
8. Push up the cover lid and close it again.
9. Press the “LOAD/EJECT” button to move the target into the measurement
position inside the vacuum system.
10. Wait for the READY LED to illuminate before beginning acquisition. The total
time from initiating the target in routine by pushing the button to when the
READY LED illuminates should not exceed five minutes and is typically less
than two and a half minutes.
4.3 Using the Twister (optional)
4.3.1 Turning the Instrument On or OFF
Instrument power is controlled with the mains switch (Figure 3-3), where:
0 = Off.
•
•
I = On.
The front panel Power
LED (Figure 3-2) illuminates when the machine is properly
powered up.
ultraflex III User Manual, Version 1.0
51