Bruker Daltonik GmbH
Installation and Setup
2 INSTALLATION AND SETUP
Please refer to the Bruker
Site Preparation Specification
document for your mass
spectrometer.
Installation and setup consists of:
Facility and Electrical Requirements (chapter 2.1).
•
•
•
•
•
•
Unpacking (chapter 2.2).
Setup (chapter 2.3).
2.1 Facility and Electrical Requirements
The facility must provide:
100 to 230 V/ 3-1.5 A / 50–60 Hz. The instrument back panel is fitted with an
IEC320–C14 mains inlet (Figure 3-3). The instrument comes with a 3 m long
IEC320 line cord and a mains plug, suitable for use in your country.
The ultraflex III mass spectrometer requires approximately 2 m
2
of space on a
surface that can safely support the full 550 kg instrument weight.
To ensure proper ventilation, and access to the connections and main switch,
maintain at least 80 cm of clearance behind the instrument.
Warning:
The main supply must provide adequate grounding.
The system has an exhaust port to accommodate venting. This port is located on the
rear of the instrument. Individual facilities may have safety guidelines, which require
ventilation. It is the responsibility of the user to adhere to the requirements of their
respective facility.
ultraflex III User Manual, Version 1.0
15