
60
Z31914_00_01
Preventative Maintenance
Weekly Preventive Maintenance
Weekly PM is performed by the operator at the end of the week, and takes only a few
minutes in addition to the daily maintenance.
Periodic Preventive Maintenance
The SamplePro hr-MAS has been developed to be maintenance free, there is no peri-
odic maintenance required. In the event problems should occur contact Bruker Service.
Maintenance Log
A log sheet should be used for verification of maintenance. Whenever preventive main-
tenance actions are performed the corresponding form should be completed.It is impor-
tant to maintain this record, as repairs necessitated by misuse; abuse or negligence is
not covered under the warranty or service contract.
11.1.1
Cleaning and Decontamination
Use a 70% ethanol solution and a lint free tissue (only) to clean and decontaminate the
instrument (e.g. deck, tips, deck trays, racks).
11.1.2
Weekly Maintenance
Weekly maintenance is performed by the operator once a week, in addition to the daily
maintenance.
1.
Check the position of the first rotor position when inserting and ejecting a rotor.
2.
Check the object sensor position when inserting and ejecting a rotor.
11.1.3
Cleaning and Lubrication
The following parts should be cleaned on a 6 monthly basis (more frequently if the unit is
in constant use).
11.1.3.1
Pickup Adapter and Object Sensor Z-racks
There is a risk of injury, infection and contamination from parts to be cleaned, which
could contain toxic and/or infected material. Appropriate protective clothing, gloves, and
glasses are required for this step!
Use a lint free tissue to clean the sensors. Move the Z-rack manually slowly up and
down several times to check for smooth movement.
•
Never apply alcohol, alcohol solutions, or lubricant to the toothed rack or sleeve
bearings, as they may expand and block Z-movement.
Содержание SamplePro hr-MAS
Страница 1: ...Version Innovation with Integrity NMR Spectroscopy SamplePro hr MAS 001 Sample Changer User Manual ...
Страница 6: ...6 Z31914_00_01 Table of Contents ...
Страница 38: ...38 Z31914_00_01 Installation and Initial Commissioning ...
Страница 44: ...44 Z31914_00_01 Assembling the Tray with Rotors ...
Страница 57: ...57 Z31914_00_01 Operation Figure 10 14Activity History ...
Страница 58: ...58 Z31914_00_01 Operation ...
Страница 62: ...62 Z31914_00_01 Preventative Maintenance ...
Страница 65: ...65 Z31914_00_01 13 EC Declaration of Conformity ...
Страница 66: ...66 Z31914_00_01 EC Declaration of Conformity ...
Страница 68: ...68 Z31914_00_01 Contact ...
Страница 70: ...70 Z31914_00_01 Warning Signs ...
Страница 72: ...72 Z31914_00_01 Figures ...
Страница 74: ...74 Z31914_00_01 Tables ...
Страница 76: ...76 Z31914_00_01 Glossary ...
Страница 80: ...80 Z31914_00_01 Index ...
Страница 81: ......