11 Installation
All the general requirements such as power supply, compressed air supply, etc. which were
discussed in the preceding chapters must first be arranged before taking delivery of the
system. It must be stressed that any installation requirements listed below such as cryogen
supplies, are
in addition
to those needed for normal system operation.
Where necessary the customer is advised to contact the local Port Authorities to clarify
arrangements for custom clearance. If the transport crates must be opened you must first
contact Bruker, as the crates are shipped utilizing Shockwatch
TM
and Tiltwatch
TM
. Failure to
do this may invalidate the warranty. If the transport crates are opened for any reason they
must then be stored indoors (out of direct sunlight).
11.1
Overview
The spectrometer system will arrive at the site in crates. The crates should only be opened by
the Bruker BioSpin service engineer. The commissioning of the magnet involves several
stages as outlined in the table below. The installation time line given below is an
approximation; each site is slightly different.
Duration
Procedure
ca. 3-8 hours
Transport fixtures are removed. Cryostat is assembled.
2-4 days
The magnet is evacuated and flushed through with nitrogen.
1-3 days
Cool down of the magnet with liquid nitrogen.
1 day
Cool down of the magnet with liquid helium.
1-2 days
Charging of the magnet.
1 day
Cryo-shimming of the magnet.
1 day
Running NMR experiments to demonstrate standard specifications.
Table 11.1:
Overview of Magnet Commissioning
11.2
Accessibility
Before the arrival on site, the customer must ensure the equipment can be delivered, and
transported safely to the final location inside the laboratory.
• Ensure that doorways, passageways and lifts have sufficient clearance.
• Extra large doorways are required for the larger magnets.
• Equipment such as forklifts or hydraulic pallet jacks are necessary for transporting the
magnet and accessories.
Содержание AVANCE
Страница 6: ...Contents vi H157655_1_008 ...
Страница 24: ...System Components 24 H157655_1_008 ...
Страница 32: ...Magnet Access and Rigging 32 H157655_1_008 ...
Страница 38: ...Ceiling Height Requirements 38 H157655_1_008 ...
Страница 42: ...Magnetic Stray Fields 42 H157655_1_008 6 3 Stray Field Plots Figure 6 1 Example of a Stray Field Plot ...
Страница 72: ...Utility Requirements 72 H157655_1_008 ...
Страница 82: ...Floor Plan 82 H157655_1_008 ...
Страница 96: ...CryoProbe and Other Accessories 96 H157655_1_008 ...
Страница 102: ...Contact 102 H157655_1_008 ...
Страница 104: ...List of Figures 104 H157655_1_008 ...
Страница 109: ...H157655_1_008 109 ...
Страница 110: ...Bruker Corporation info bruker com www bruker com Order No H157655 ...