3-7
1000 HOUR OR 12 MONTH INTERVAL:
1. 500 hour maintenance.
2. 50, 250, 1000 hour and 12 month lubrication.
3. Change hydraulic fluid and filter and clean breather and reservoir.
4. Change transmission fluid and filter and clean strainer.
5. Replace vapor block inside slip ring. See turret installation in parts manual.
6. Perform all maintenance required by engine manual.
7. Place vapor block inside slilp ring. See turret installation in parts manual.
24 MONTH INTERVAL:
1. 12 month maintenance.
2. Pressure test engine cooling system.
3. Flush cooling system.
4. Fill with new coolant and distilled water.
5. Perform all maintenance required by engine manual.
S/N:_______________ HOURS:________ DATE:________ BY:_____________________
COMMENTS & PARTS REQUIRED:___________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
Содержание IC-200-2H
Страница 6: ...1 2 IC 200 2H DIMENSIONS Courtesy of Crane Market...
Страница 7: ...1 3 IC 200 3H DIMENSIONS Courtesy of Crane Market...
Страница 8: ...1 4 IC 200 H TURNING DIMENSIONS Courtesy of Crane Market...
Страница 18: ...Courtesy of Crane Market...
Страница 32: ...2 14 Courtesy of Crane Market...
Страница 33: ...2 15 Courtesy of Crane Market...
Страница 53: ...3 9 IC 200 LUBRICATION CHART Courtesy of Crane Market...
Страница 60: ...3 16 Courtesy of Crane Market...
Страница 61: ...3 17 Courtesy of Crane Market...
Страница 69: ...3 25 IC 200 3 BOOM CHAIN ADJUSTMENT Courtesy of Crane Market...
Страница 74: ...Powered by TCPDF www tcpdf org Courtesy of Crane Market...