Push and hold down the lift button (Button 4 section 3.6) to activate the
electrical raising of the basket platform. Release of the button automat-
ically stop its movement.
Push and hold down the lowering button (Button 5 section 3.6) to acti-
vate the lowering of the basket platform. Release of the button auto-
matically stop its movement.
Steering Rocker Switch
The Steering has been designed to be easily activated with the left
hand.
Push the Steering switch left toward the right or the left or the right and
hold it in this position as long as one desires that the direction chosen
be maintained.
Remember to activate both of the foot switches and the left and right
hand sensors to actuate the raising/lowering/driving functions.
Raise/Lower Cargo Platform Button
The cargo material compartment has been designed for a maximum load of
90 kg. It may be rapidly raised or lowered vertically on the front part of the
elevator group using the relative buttons on the machine.
Push and hold down the upper button (Button 8 section 3.6) to activate the
electrical lifting of the cargo platform. Release of the button automatically
stop its movement.
Push and hold down the lower button (Button 7 section 3.6) to activate the
lowering of the cargo platform. Release of the button automatically stop its
movement.
Acoustic Signal Device Button
When the machine is turned on, the pressure on this button
determines the activation of the acoustic signal device.
Platform Raising and Lowering Buttons
The operator must not for any reason climb up
on top of the basket railings, nor place ladders or other things there, in or-
der to achieve greater heights at which to work. In addition, he or she must
never lean out or extend him/her self outside of the railing of the platform
basket.
Before activating the machine, verify that:
•
the platform is positioned on a clean pavement, free of holes, levelled,
of an adequate consistency,
•
where there are no aerial obstacles in the zone where work is to be
done
ATTENTION
28
29
SECTION 3.
OPERATION OF THE MACHINE
Содержание Sprint LUI MINI P.A.
Страница 25: ...48 49 SECTION 5 GENERAL TECHNICAL SPECIFI CATIONS AND OPERATOR MAINTENANCE...
Страница 26: ...50 51 SECTION 5 GENERAL TECHNICAL SPECIFI CATIONS AND OPERATOR MAINTENANCE...
Страница 33: ...SECTION 7 7 2 HYDRAULIC SCHEME LUI PKI 6 6 64 65...
Страница 34: ...SECTION 7 7 3 HYDRAULIC SCHEME LUI MINI P A 66 67...
Страница 35: ...SECTION 7 7 4 WIRING DIAGRAM LUI PKI 68 69...