Dry the terminal connectors well
•
Put the connectors back in their place, pay-
ing close attention to the correct positive/
negative pole connection, then tighten well.
•
Coat the terminal connectors with a protec-
tive lubricant for electrical contacts (such as
a lubricant with a Pharmaceutical Vaseline
oil base).
Battery Water Inspection
The battery water level is to be performed every 4 working days or AFTER
each and every battery recharge.
It is possible to check the levels by lifting the cover.
The water level must always be at least 5 mm above the internal element
plates. If necessary, top up the level with
demineralised water.
Given that part of the water evaporates during recharging it is necessary to
check the level again after 30 minutes of work.
Perform the job for 30 minutes, and then repeat the battery check and top
up procedure until the proper level is achieved.
Disconnect the A.C. power cable from the machine before checking
the water level.
Cleaning of the machine
As the machine works in presence of dusts, it must be daily or whenever it
would be necessary clean it.
With a cloth slightly moistened, clean:
-
the control panels,
-
the walking surface of the machine,
-
the operator ascent and descent zone.
PRELIMINARY INSPECTIONS BEFORE START UP
CHECK
-
LIST
MODEL______________________
SERIAL NUMBER______________
YEAR OF MANUFACTURE_________
DATE
INSPECTION PERFORMED BY
_____________
----------------------------
Cleaning –
Verify and check for any eventual leaks (oil,
hydraulic fluid or battery acid) or for foreign objects on
any of the surfaces.
Signs and Adhesive Stickers
Check and verify that all of these are clean and legible.
Check that no sign or adhesive is missing.
Make sure that any sign or adhesive that is not legible is
cleaned or substituted.
Use and safety manuals –
make sure that in the weath-
er resistant compartment all of the following manuals are
present:
Use and Safety Manual
EMI Safety Manual (only for
ANSI/CSA specifications) and the ANSI responsibility
Manual (only for ANSI/CSA specifications).
Battery –
Charge as needed
SECTION 6.
INSPECTION AND REPAIR LOG
58
59
SECTION 5. GENERAL TECHNICAL SPECIFI-
CATIONS AND OPERATOR MAINTENANCE
Содержание Sprint LUI MINI P.A.
Страница 25: ...48 49 SECTION 5 GENERAL TECHNICAL SPECIFI CATIONS AND OPERATOR MAINTENANCE...
Страница 26: ...50 51 SECTION 5 GENERAL TECHNICAL SPECIFI CATIONS AND OPERATOR MAINTENANCE...
Страница 33: ...SECTION 7 7 2 HYDRAULIC SCHEME LUI PKI 6 6 64 65...
Страница 34: ...SECTION 7 7 3 HYDRAULIC SCHEME LUI MINI P A 66 67...
Страница 35: ...SECTION 7 7 4 WIRING DIAGRAM LUI PKI 68 69...