32
Phenolic Privacy Restroom Partitions, Floor-to-Ceiling — Series 700, — 69", 72" & 69"/72" Tall
Installation
6/25/2021
Bradley •
HDWC-INSTR-045 Rev. A: ECO 20-14-002S
10 Urinal Screens with Stirrup Brackets (Standard)
Before installing the urinal screen components, determine the correct
location for your application.
Draw a plumb line on the wall to represent the urinal screen
centerline . Measure from the highest point in the room and
place a mark on the urinal screen centerline at dimensions
"A", "B", and "C" for the respective urinal screen height (see
table below) .
A
Position and center brackets at each mark on the urinal
screen centerline . Using the bracket as a template, mark the
hole locations on the wall . Remove the bracket and drill a
Ø5/16" hole (minimum 2" (51) deep) at each hole location .
B
Place the urinal screen at dimension "D" for the respective
urinal screen height (see table on right) and insert it into the
wall brackets until a 1" (25) gap between the wall and urinal
screen is established .
D
Insert plastic anchors in all holes and secure bracket to the
wall with the #14 x 2" screws provided .
C
Using the bracket as a template, drill Ø1/4" holes through the
urinal screen at each bracket hole . Secure the urinal screen
to the brackets with the #10-24 x 1/2" barrel nuts and
#10-24 x 1/2" shoulder screws provided .
E
"A"
"B"
Floor
Dim "A"
Dim "B"
Dim "C"
Dim "D"
42" Urinal Screen
24"
(610)
39"
(991)
54"
(1372)
18"
(457)
48" Urinal Screen
18"
(457)
36"
(914)
54"
(1372)
12"
(305)
"C"
"D"
Urinal Plumb Line