6
Bradmar
™
Restroom Partitions, Floor-Mounted with Overhead Brace — Series 400
Installation
10/1/2014
Bradley
•
HDWP-INSTR-013 Rev. K; ECN 12-14-012
4a Stirrup Brackets to Pilaster (Optional)
Refer to the submittal drawing to locate the split
dimension and layout location of each marked pilaster.
Locate Brackets:
Measure down from the top of the pilaster
and place a mark on the pilaster split centerline at dimension
"A", "B" and "C" for the respective bracket (see table at left).
Pilaster shown is for reference only.
Actual pilaster varies depending on application.
A
Place the center of each stirrup bracket at each
established level line. Center the bracket opening
on the panel plumb line. Using the bracket as
a template, mark the hole locations on the
pilaster. Remove the bracket and drill a Ø
⁷⁄₃₂
" x
¾"(19mm) deep pilot hole at each location.
B
Split
Split
"A"
"B"
"C"
"U"
Bracket
"H"
Bracket
Dim . "A"
19"
(483mm)
13½"
(343mm)
Dim . "B"
40½"
(1029mm)
67½"
(1715mm)
Dim. "C"
62"
(1575mm)
—
Secure the stirrup brackets to
the pilasters using the #14 x ¾"
screws provided .
Refer to step 4 for location and
attachment of "H" bracket.
C
5
Pilaster Shoes
This view is an example only. Refer to your submittal drawings for actual sizes. Layout the
pilaster and door widths on the pilaster centerline, leaving the appropriate gap between
the wall and pilaster . Place the corresponding shoe on the pilaster centerline, center the
shoe between the pilaster marks. Using the shoes as a template, mark the hole locations.
A
Insert plastic anchors
into the holes and fasten
the shoe to the anchors
using hardware provided .
C
Drill Ø
⁵⁄₁₆
" holes (min 2"
[51mm] deep) in the floor
and make sure the holes
are free of dirt and debris.
B
Install the shoes starting with the one closest to the wall
36" (914mm)
Door Opening
Pilaster Centerline
24" (610mm)
4"
(102mm)
7"
(178mm)
1" (25mm) Gap
26" (660mm)
Door Opening
⁹⁄₃₂
" x
⁵⁄₈
" Flat Washer
#14 x 2" Screw
Stainless Steel Shoe
Plastic
Anchor