background image

5

Installation

 

Bradmar

 Restroom Partitions, Floor-Mounted with Overhead Brace — Series 400

Bradley 

• 

HDWP-INSTR-013 Rev. K; ECN 12-14-012

 

10/1/2014

3

Leveling bolts to Pilaster

Notch indicates 

bottom of integral 

hinge pilaster

Notch indicates 

bottom of integral 

hinge pilaster

Use leveling screw to adjust 

height of pilaster

Use leveling screws to 

adjust height of pilaster

Drill a Ø 

¹³⁄₆₄

" pilot hole, 

1½" (38mm) deep. Hole 

should be approximately 

centered for pilasters 3"–16" 

(76mm–406mm) wide.

A

Drill a Ø 

¹³⁄₆₄

" pilot hole, 1½" (38mm) 

deep. Hole should be 2"(51mm) 

off each end for the pilasters 

18"–24"(457mm–610mm) wide.

A

4

Continuous Brackets to Pilaster (Standard)

Refer to the submittal drawing to locate the split 

dimension and layout location of each marked pilaster.

Locate Brackets: 

Measure down from the top of the 

pilaster and place a mark on the pilaster split centerline 

at dimensions at 13½"(343mm) and 67½"(1715mm).

 Pilaster shown is for reference only. Actual pilaster 

varies depending on application.

A

Secure the brackets. 

For "H" Bracket:

 Use the bracket as a 

template, drill a Ø ¼" holes through the 

pilaster/panel and secure the bracket to 

the pilaster and panel with #10-24 x ¾" 

barrel nuts and #10-24 x ¾" shoulder 

screws provided .

For continuous bracket:

 Secure the bracket 

to the pilasters using the #14 x ¾" screws 

provided .

C

Split

Split

13½" 

(343mm)

67½" 

(1715mm)

Place the continuous bracket between each established 

level line. Center the bracket opening on the pilaster 

split centerline. Using the bracket as a template, mark 

the hole locations on the pilaster. Remove the bracket 

and drill a Ø 

⁷⁄₃₂ 

x ¾" (19mm) deep pilot hole at each 

location .

B

Brackets are used as templates but, since the hole patterns may 

be different, the brackets may not be interchanged.

C

L

Содержание Bradmar 400 Series

Страница 1: ...enance department Compliance and conformity to local codes and ordinances is the responsibility of the installer Separate parts from packaging and make sure all parts are accounted for before discardi...

Страница 2: ...ar saw Two spring clamps and drill bits Power drill or screw gun with drill bit extension Tape measure and 4 level ceramic tile and masonry drill bit Hammer drill Spacer 14 356mm high and strong enoug...

Страница 3: ...present the hole center line of the stirrup brackets Use a level to transfer that mark to all other plumb lines C Panel plumb line 63 1600mm 41 1054mm A B B1 A1 C C C C C C C C C 20 508mm C L C L C L...

Страница 4: ...Remove the bracket and drill a hole min 2 51mm deep at each hole location B One Eared Bracket Two Eared Bracket 2 Continuous Brackets to Wall Standard established level line pilaster panel plumb line...

Страница 5: ...Measure down from the top of the pilaster and place a mark on the pilaster split centerline at dimensions at 13 343mm and 67 1715mm Pilaster shown is for reference only Actual pilaster varies dependi...

Страница 6: ...Split A B C U Bracket H Bracket Dim A 19 483mm 13 343mm Dim B 40 1029mm 67 1715mm Dim C 62 1575mm Secure the stirrup brackets to the pilasters using the 14 x screws provided Refer to step 4 for locat...

Страница 7: ...13mm between the panel and pilaster Using the bracket as a template drill holes through the pilaster at each pilaster bracket hole Secure the pilaster to the bracket with 10 24 x barrel nuts and 10 24...

Страница 8: ...m between the panel and pilaster Using the brackets as a template drill holes through the pilaster at each pilaster bracket hole Secure the pilaster to the bracket with 10 24 x barrel nuts and 10 24 x...

Страница 9: ...spacing between the pilasters for the doors is the correct dimension On the back of each pilaster starting with the first pilaster drill a hole through one face of the headrail only Using this hole as...

Страница 10: ...rt the spring and the top pin into the pilaster top Move the top of the door into position while pushing the top pin into the pilaster Release the top pin and force the pin to bottom out in the door C...

Страница 11: ...3 Top Pin Lip Lip 3 76mm 3 Top Pintle 3 Bottom Pintle Assembly Notch Feature for adjacent door strike 19mm 1 44mm 13mm Drill first hole as shown Attach and align heat sink with single screw 6 x flat h...

Страница 12: ...a 8 x 1 flat head Phillips drive screw To adjust spring tension use a torx screwdriver and turn the torx head clockwise approximately one complete revolution Insert a 1 38mm long nail into the hole th...

Страница 13: ...d to the shoe and that the headrail is installed Determine the door swing by facing the compartment from the outside Refer to your submittal drawings to determine each specific door swing for your app...

Страница 14: ...or Use tape to hold the hinge sets together H Place the upper blank of the top hinge set on the door 2 51mm from the top Using the hinge as a template drill a x 1 25mm deep pilot hole into the edge of...

Страница 15: ...the door so that the slide bar is centered in the slot on the strike keeper The leading edge of the latch should be positioned approximately 10mm from the door edge Install the coat hook in the upper...

Страница 16: ...so that the slide bar is centered on the strike keeper The leading edge of the latch should be positioned approximately 1 25mm from the door edge Install the coat hook according to local codes For su...

Страница 17: ...as a template drill a pilot hole into the door 19mm deep Secure the latch to the door using hardware provided B With the door in the closed position mount the latch on the inside of the door so that...

Страница 18: ...A B G F H With the door in the closed position mount the latch on the inside of the door so that the center of the slide bar is 27 699mm from the top of the door The leading edge of the latch should b...

Страница 19: ...16 and larger B Using the bracket as a guide drill a x deep pilot hole at each screw hole location The stiffener bracket is installed on the largest side of a pilaster split B Using the bracket as a g...

Страница 20: ...hole locations on the wall Remove the bracket and drill a x min 2 51mm deep hole at each hole location C Place the bottom of the continuous bracket at the established level line Center the bracket ope...

Страница 21: ...e hole locations on the wall Remove the bracket and drill a x min 2 51mm deep hole at each hole location B Place the bottom of each urinal screen 18 457mm up from floor Establish a 1 25mm gap between...

Отзывы: