Restroom Partitions, Floor-Mounted with Overhead Brace — Series 400
Installation
10/1/2014
Bradley
•
HDWP-INSTR-013 Rev. K; ECN 12-14-012
Before installing the urinal screen components,
determine the correct location for your application.
Brackets are used as templates but, since the hole patterns
may be different, the brackets may not be interchanged.
Draw a plumb line on all walls
representing urinal screen
centers. Measure 18½" (470mm)
up for 42" (1067mm) tall urinal
screens or 21½" (546mm) up for
48" (1219mm) tall urinal screens
from the floor and place a mark
on the plumb line. Use a level
to transfer that mark to all other
plumb lines
.
A
Using the bracket as a template mark
the hole locations on the wall . Remove
the bracket and drill a Ø
⁵⁄₁₆
" x min . 2"
(51mm) deep hole at each hole location
.
C
Place the bottom of the
continuous bracket at
the established level line.
Center the bracket opening
on the plumb line.
B
Drill Ø ¼" holes through the screen at
each bracket hole
. Secure the screen
to the bracket with #10-24 x ¾"
barrel nuts and #10-24 x ¾" shoulder
screws provided .
F
18½"(470mm) for
42"(1067mm) tall screens
or 21½" (546mm) for
48"(1219mm) tall screens
estab
lished
level line
ur
inal
plumb
line
floor
11
Urinal Screens with Continuous Brackets (Standard)
Place the bottom of each urinal screen
18" (457mm) up from floor. Establish a 1"
(25mm) gap between the finished wall and
urinal screen edge . A spacer may help
to support the weight of the screen and
establish the appropriate distances.
E
Insert the plastic
anchors in all holes
and secure the bracket
with the #14 x 2"
screws provided .
D