20
en | Planning
Dinion IP Infrared Imager
F.01U.263.416 | 3.1 | 2012.09
User Manual
Bosch Security Systems, Inc.
3.1
Pre-installation Checklist
1.
Determine the location and distance for the junction box
based on its voltage and current consumption.
See the Installation Manual on the product CD for wiring
information and distances.
2.
Use only UL-listed liquid tight strain reliefs for conduits to
the junction box to ensure that water cannot enter the box.
You must use 3/4 in. (20 mm) NPS watertight conduits and
fittings (to meet NEMA 4X standards).
3.
Route all rough wiring including: power, control, video
coax, alarms I/O, and relay I/O. See
Section 5 Ethernet
Connection (IP models), page 28
the Installation Manual on
the product CD for video and control protocol methods.
WARNING!
This installation must be made by a qualified service person and
must conform to all local codes.
WARNING!
CSA Certified / UL Listed CLASS 2 (or Certified PoE+ rated 42.5
VDC to 57 VDC, 600 mA, 34.20 W (max), for IP models) power
adapters must be used in order to comply with electrical safety
standards.
WARNING!
Power and I/O cabling must be routed separately inside
different permanently earthed metal conduits.
Содержание NEI-308V05-13WE
Страница 1: ...Dinion IP Infrared Imager NEI Series en User Manual ...
Страница 2: ......
Страница 121: ...Dinion IP Infrared Imager Index en 121 Bosch Security Systems Inc User Manual F 01U 263 416 3 1 2012 09 ...
Страница 122: ...122 en Index Dinion IP Infrared Imager F 01U 263 416 3 1 2012 09 User Manual Bosch Security Systems Inc ...
Страница 123: ......