27
BA-077/1EN M6X.20XX
4.1 - Creating a setup plan
4.1.1) Identifying drilling head and ruler
• In the overview on pages 38 and 39, select the required gearbox and ruler for the
desired assembly application.
4.1.2) Template set-up plan
• Fill out header data
Explanation of symbols
4.1.3) Creating work piece drawings on the set-up plan
• Make hand drawings on set-up plan
or
Coping drawing to set-up plan
Note
To better understand the following description and procedures, take a
look at the included sample setup plan.
.. Enter partial description
--- Enter work procedure
... Enter creation date
... Enter comments
... Enter page no.
... Enter number of pages
... Vertical drilling
... Horizontal drilling
4 - Working with PRO-CENTER
L
!