KB ECO / KB ECO-UL (E6.2) 12/2021
Page 58/85
22. Options
22.1 APT-COM™ 4 Multi Management Software (option)
The chamber is regularly equipped with an Ethernet interface (6) that can connect the BINDER APT-COM™
4 Multi Management Software. The MAC Address is indicated in the “Ethernet” controller menu (chap.
16.1.1). The actual temperature values are given at adjustable intervals. Programming can be performed
graphically via PC. Up to 100 chambers can be cross-linked. For further information please refer to the
APT-COM™ 4 operating manual.
22.2 Data logger kit (option)
BINDER Data Logger Kit offers an independent long-term measuring system for temperature, available for
different temperature ranges.
The BINDER Data Logger is equipped with a keyboard and a large LCD display, alarm functions and a
real-time function. Measurement data are recorded in the Data Logger and can be read out after the meas-
urement via the RS232 interface of the Data Logger. It offers a programmable measuring interval and
permits storing up to 64000 measuring values. Reading out is done with the Data Logger evaluation soft-
ware. You can give out a combined alarm and status protocol directly to a serial printer.
Data Logger Kit T 220:
Sensor for chamber temperature: Temperature range -90 °C /
194 °F
up to +220 °C
/
428 °F.
For detailed information on installation and operation of the BINDER Data Logger, please
refer to the mounting instructions Art. No. 7001-0204 and to the original user manual of the
manufacturer, supplied with the data logger.
23. Cleaning and decontamination
Clean the chamber after each use in order to prevent potential corrosion damage by ingredients of the
loading material.
Prior to renewed startup, allow the chamber to completely dry after all cleaning and decontamination
measures.
DANGER
Electrical hazard by water entering the chamber.
Deadly electric shock.
∅
Do NOT spill water or cleaning agents over the inner and outer chamber surfaces.
∅
Do NOT put ANY cleaning aids (cloth or brush) into slots or openings on the chamber.
Before cleaning, turn off the chamber at the main power switch and disconnect the
power plug. Let the chamber cool down to ambient temperature.
Completely dry the chamber before turning it on again.
Содержание 9020-0423
Страница 72: ...KB ECO KB ECO UL E6 2 12 2021 Page 72 85 26 7 Dimensions Dimensions size 240 mm...
Страница 73: ...KB ECO KB ECO UL E6 2 12 2021 Page 73 85 Dimensions size 720 mm...
Страница 74: ...KB ECO KB ECO UL E6 2 12 2021 Page 74 85 Dimensions size 1020 mm...
Страница 76: ...KB ECO KB ECO UL E6 2 12 2021 Page 76 85...
Страница 77: ...KB ECO KB ECO UL E6 2 12 2021 Page 77 85...
Страница 79: ...KB ECO KB ECO UL E6 2 12 2021 Page 79 85...