MK (E3) 07/2009
page 39/70
9.9
Temperature profile and operation lines template
Programmer:
Programm No. (1 to 25):
Operation line 1:
Operation line 1 controls the bedew protection
Program title:
Date:
Operation line 2:
1 = On = active
Project:
Operation line 3:
0 = Off = not active
Time
-20
0
20
40
60
80
100
120
140
160
°C
Off
On
Operation line 1 = Bedew protection
-40
180
Off
On
Operation line 2
Off
On
Operation line 3
Содержание 9020-0146
Страница 65: ...MK E3 07 2009 page 65 70 18 9 Dimensions MK 115 ...
Страница 71: ......