43
"
Boiler Status
"
“
Dep. 1
”
“
Dep. 1
”
Home /
"
Menu
"
"
Information
"
Level
0
Level
1
Level
2
Level
3
Level
4
Level
5
Level
6
"
Flow T
emperature
"
"
0-10 V Input
"
"
Flow
2 T
emperature
"
"
Flowrate
"
"
Return T
emperature
"
"
RT
Input
"
"
Outside T
emperature
"
"
State
"
"
DHW T
emperature
"
"
Fan Speed
"
"
Flue T
emp
"
"
Error
"
"
DCW T
emperature
"
"
Ionisation
"
"
System T
emperature
"
"
Calculated Setpoint
"
“
Dep. 15
”
“
Dep. 15
”
...
...
"
Boiler History
"
"
Successful Ignitions
"
"
Successful Ignitions
"
"
Failed Ignitions
"
"
Failed Ignitions
"
"
Flame Failures
"
"
Flame Failures
"
"
Operation Days
"
"
Operation Days
"
"
CH Burner Hours
"
"
CH Burner Hours
"
"
DHW Burner Hours
"
"
DHW Burner Hours
"
“
Managing
”
Содержание 20141085
Страница 1: ...Installation Manual Modular system Power Max Box Installation Manual EN...
Страница 109: ...SYSTEM MANAGER 109...
Страница 110: ...SYSTEM MANAGER 110...
Страница 111: ...SYSTEM MANAGER 111...