18
18
StEP 9
(
Installing the Safeties and Safety Cable)
1. Install Safety Weldments into each respective Column.
(See Figs 9.1 & 9. 2)
2. From the Offside Column insert the non looped end
of the Safety Cable through the hole located to the right of
the Offside Safety Weldment. (See Fig 9.3)
3. Route the Cable under the Pulley and take it up to the
Top Trough. (See Fig 9.4)
DANGER !
ENSuRE tHAt BotH tHE
PoWERSIDE & oFFSIDE SAFEtIES ENGAGE
PRoPERLy PRIoR to LIFt oPERAtIoN.
Fig 9.1
Fig 9.2
Fig 9.3
Fig 9.4.
Содержание XpR-10AC-168
Страница 25: ...25 25 ...
Страница 28: ...28 ...
Страница 32: ...32 32 OPTIONAL EQUIPMENT INSTALLATION ...
Страница 42: ...42 42 ...
Страница 43: ...43 43 ...
Страница 52: ...52 52 ...
Страница 74: ...74 ...
Страница 75: ...75 ...