Operation
52
ATICS-DIO_D00080_01_M_XXEN/04.2015
6.2.4.3
Test menu 3: Last switch
If the ATICS® has changed over due to a failure or a planned shutdown of the preferred line, then the
last switching operation can be saved as a test.
1. Date
Date of the last changeover
2. Test
Date on which the next test is due
Overwrite
Date of last changeover is saved as a test date
1. Save
Saves the date of last changeover as the test date, as long as that date is later
than the previous entry.
2. Cancel
Back to test menu "Last switch"
After saving, the date on which the next test is due is counted up by the test interval (in this case, 6
months).
The date of the test is saved in the test logger to remember the next test once the test interval has
elapsed. An changeover period is not saved. The messages from this test are also stored in the history
memory.
Last switch
1.Date: 20.09.11
2.Test: 02.03.10
Save
Save
Cancel
Save
Last switch
1.Date: 20.09.11
2.Test: 21.03.11
Save
Содержание ATICS-2-63A-DIO
Страница 22: ...System description 22 ATICS DIO_D00080_01_M_XXEN 04 2015...
Страница 44: ...Commissioning settings and testing 44 ATICS DIO_D00080_01_M_XXEN 04 2015...
Страница 58: ...Operation 58 ATICS DIO_D00080_01_M_XXEN 04 2015...
Страница 86: ...Troubleshooting 86 ATICS DIO_D00080_01_M_XXEN 04 2015...
Страница 95: ...95 ATICS DIO_D00080_01_M_XXEN 04 2015 10 Data 10 1 T V test report...
Страница 102: ...Data 102 ATICS DIO_D00080_01_M_XXEN 04 2015...