Installation EAGLE20/30
Release 11 09/2020
37
2.6
Operating the device
Note:
Relevant for North America:
The torque for tightening the supply voltage terminal block on the device is
4.5 lb-in (0.51 Nm).
The torque for tightening the signal contact and input terminal block on the
device is 3 lb-in (0.34 Nm).
Use screws to secure the connectors to the device.
Enable the supply voltage.
2.7
Connecting data cables
2.7.1
Twisted Pair ports
Note the following general recommendations for data cable connections in
environments with high electrical interference levels:
Keep the length of the data cables as short as possible.
Use optical data cables for the data transmission between the buildings.
When using copper cables, provide a sufficient separation between the
power supply cables and the data cables. Ideally, install the cables in
separate cable channels.
Verify that power supply cables and data cables do not run parallel over
longer distances, and that ideally they are installed in separate cable
channels. If reducing the inductive coupling is necessary, verify that the
power supply cables and data cables cross at a 90° angle.
Use shielded cables (SF/UTP cables as per ISO/IEC 11801:2002).
Connect the data cables according to your requirements.
See “10/100 Mbit/s twisted pair port” on page 21.
See “100/1000 Mbit/s twisted pair port (optional)” on page 22.
WARNING
ELECTRIC SHOCK
Before connecting the electrical wires,
always
verify that the requirements
listed are complied with.
See “Requirements for connecting electrical wires” on page 7.
Failure to follow these instructions can result in death, serious injury,
or equipment damage.
Содержание Hirschmann EAGLE20
Страница 59: ...Installation EAGLE20 30 Release 11 09 2020 59...
Страница 60: ......