PN A51387A
B
3-27
Installing and Calibrating an Aperture Tube
The Change Aperture Tube Wizard
3
Step 4: Place a Beaker of Clean Electrolyte on the Platform
It is necessary to place a beaker of clean electrolyte on the platform before filling the system. If the
aperture is not immersed in electrolyte while the system fills, the Analyzer will draw air through
the aperture and into the system during the fill procedure.
To place a beaker of clean electrolyte on the platform:
1.
Wash the beaker. For instructions on the proper cleaning method, see
Tube, Beakers, and Accuvette® STs
, page
.
2.
Fill the beaker with electrolyte solution.
3.
Open the Sample Compartment door.
4.
If necessary, press the platform release (see
) and lower the platform
to the loading position.
5.
Place the beaker on the platform (beaker side up). The beaker guides ensure that a Multisizer 4
Smart Technology Beaker of any size will be in the correct position in relation to the aperture
tube, electrode, and stirrer when you raise the platform.
If you are using an Accuvette® ST, reverse the platform to use the Accuvette® ST guide (see
).
6.
Raise the platform until it locks into position for an analysis run. It is not necessary to use the
platform release when you raise the platform.
7.
Fill the Electrolyte Jar with the same electrolyte solution used in the ST Beaker.
In the Change Aperture Tube Wizard, click
(
Next
)
to proceed to the next step, Close the door
(page
).
Step 5: Close the Door
If the software detects that the Sample Compartment door is closed, the Wizard will skip this step.
If the Sample Compartment door remains open when you attempt to start an analysis run, the
amber light will flash, and the software will display an error message.
In the Change Aperture Tube Wizard, click
(
Next
)
to proceed to the next step, Fill the System.
Содержание Multisizer 4
Страница 12: ...xii List of Figures ...
Страница 14: ...xiv List of Tables ...
Страница 22: ...PN A51387AB xxii Introduction Before You Start Warnings and Cautions ...
Страница 42: ...PN A51387AB 1 20 Analyzer Overview Preparing the Analyzer for Sample Runs ...
Страница 90: ...PN A51387AB 3 36 Installing and Calibrating an Aperture Tube Running a Concentration Control Sample ...
Страница 160: ...PN A51387AB 6 16 Analyzing a Sample Using Blank Runs ...
Страница 232: ...PN A51387AB 10 8 Regulatory Compliance Additional Security Features ...