Commissioning
Fig. 129:
Lag monitoring
Commissioning the motor with the NC
• Once the parameters are set, the motor is basically ready for operation. Individual further parameters
have to be adapted to the respective application.
• To commission the axis, activate the configuration (Ctrl+Shift+F4), select the axis, select tab
Online
and enable the axis under Set.
• Set all tick marks and set
Override
to 100% (see Fig.
Enabling an axis
). The axis can then be moved.
EL72x1-0010
102
Version: 2.0
Содержание EL7201-0010
Страница 2: ......
Страница 12: ...Product overview 3 Product overview 3 1 Introduction Fig 8 EL7201 Fig 9 EL7211 EL72x1 0010 12 Version 2 0 ...
Страница 47: ...Commissioning Fig 42 TCP IP setting for the Ethernet port EL72x1 0010 47 Version 2 0 ...
Страница 57: ...Commissioning Fig 61 EtherCAT terminal in the TwinCAT tree EL72x1 0010 57 Version 2 0 ...
Страница 119: ...Commissioning Fig 148 Touch Probe inputs EL72x1 0010 119 Version 2 0 ...
Страница 138: ...Commissioning Fig 168 Process Data tab SM2 EL72x1 0010 default EL72x1 0010 138 Version 2 0 ...
Страница 142: ...Commissioning Fig 171 Process Data tab SM2 EL72x1 0010 default EL72x1 0010 142 Version 2 0 ...