BANLAW ResTrack BFTAC Series Скачать руководство пользователя страница 16

BANLAW PRODUCT DATA SHEET 

 

RESTRACK ADVANCED CONTROLLER 

Doc ID: PRH-FMG-21      Version: 1.0

 

 

 Page 

16

 of 

20

 

Please ensure you have the latest version of this document.

 

5.1

 

Preventative Maintenance 

The integrity (sound working condition) of refuelling couplings and tank overfill protection systems is 
critical to ensure all equipment can be operated in a safe and proper manner. 

The working life of equipment depends on many factors, including the environment in which it operates. 
Dusty  and  dirty  environments  are  more  prone  to  contamination.  Due  to  the  many  varied  operating 
environments  in  which  Banlaw  equipment  is  used,  any  preventative  maintenance  information  provided 
within this document shall be used a guide 

 unless noted otherwise. 

The ResTrack Advanced Controller contains electrical and electronic components, which are reliant on door 
seals to be maintained regularly. In the event of failure of a door seal, liquid and dust ingress to the electronic 
parts will definitely accelerate damaging effects to the Advanced Controllers electronics. This will eventually 
cause a system malfunction of the ResTrack Advanced Controller. 

The following preventative maintenance guidelines apply to the ResTrack Advanced Controller: 

 

Keep the Touch-screen clean. 

 

Avoid operating the Touch-Screen with dirty fingers, PPE and/or clothing contaminated with fuel.  

 

Keep the Advanced Controller cabinet clean and closed all the time. 

 

Keep the door seal in working condition 

 

Avoid operating high voltage and electromagnetic equipment near the Controller. 

 

Avoid powering the Controller with unstable power supplies. 

 

Maintain the use of the receiver Dust Cap and Nozzle Anchors and Holster. 

 

Remove any contamination from the dry-break Auto-ID receiver prior to connecting a Nozzle. 

 

Visually inspect the receiver for excessive wear and tear or damage prior to connecting a Nozzle. 

 

Ensure adequate controls and conditions monitoring are in place to ensure the contamination 
levels (and other specifications) of your fuel supply are maintained 

 

PREVENT 

inadequate quality 

fuel entering your site fuel infrastructure and plant equipment.  

 

5.2

 

Banlaw Site Service and Preventive maintenance 

Clients can benefit from a 

Banlaw Service Level Agreement (SLA) 

to assist in the preventative and corrective 

maintenance of the Advanced Controller. Other fuel and lubricant storage assets onsite can also be managed 
via a Banlaw SLA for peace of mind. Clients with an SLA can 

focus on their core business activities 

and allow 

experienced Banlaw technicians and engineers to help keep such infrastructure operating at optimum 

safety, 

performance and reliability. 

 

 

Содержание ResTrack BFTAC Series

Страница 1: ...tify asset liquid cost profiles While the controller may be used for a range of industrial liquids this document willin the main refer to hydrocarbon fuels The Advanced Controller is the key device to...

Страница 2: ...el cabinet door latch may be locked with an 8 mm shackle padlock The system is capable of controlling and monitoring fluids from delivery via control valves and pumps to storage tanks Accuracy of flui...

Страница 3: ...only to authorised machines vehicles operators Automatic recording of fluid deliveries and fluid dispensing Accurate fluid metering with temperature correction Secure dispensing of fluids only to auth...

Страница 4: ...e you have the latest version of this document Figure 4 Banlaw ResTrack Cabinet Typical configuration The ResTrack Controller has an industrial PC at the core Figure 5 illustrates where important conn...

Страница 5: ...ADER 1 NONE Not required Based on site requirements and preferences 2 CARDAX Gallagher Cardax reader installed 3 HID HID PROXPRO reader installed NUMBER OF FTPs 1 1 off One Fluid Transfer Point interf...

Страница 6: ...an assessment deems the Banlaw product s to be suitable the customer or end user shall ensure effective change management applies should any prominent or influential aspect of the application upon whi...

Страница 7: ...ch Screen Size 35 5cm 14in 22 cm 8 7in for Service Trucks USB USB 2 0 and 3 0 Operation Temperature Range 25 to 50 C 13 to 122 F Certification RCM Cabinet Material Composition Stainless Steel Dimensio...

Страница 8: ...be reported on in the future while showing flow totals and tank levels locally to users The appropriate care should be taken to position the Advanced Controller out of direct sunlight This can only h...

Страница 9: ...d parts Make a general arrangement of where the Controller will be fixed and all associated components Make an assessment of where the hoses can stretch to and fall naturally Make sure the Advanced co...

Страница 10: ...stem response Verify the FTP cards are powered up and the configuration is corrected using the DIP switches and the led states Make sure that the API table is downloaded to the FTP cards if temp compe...

Страница 11: ...action refuelling a unit with the Banlaw ResTrack Advanced controller Equipment that is damaged leaking or otherwise unfit for operation must not be used Maintenance should be carried out to replace o...

Страница 12: ...o ID Refuelling Step Instruction 1 Move the unit into the fuelling area 2 Halt the vehicle as required by site procedures 3 Remove the receiver dust cap 4 Using a clean rag thoroughly clean the receiv...

Страница 13: ...d remove the splash fill nozzle and turn OFF pump and place nozzle on holster or bowser ResTrack will now detect zero fuel flow and after 30 seconds will close the fuel line actuator The volume dispen...

Страница 14: ...his document Figure 11 Manual Delivery Screen Step 2 Select the correct nozzle number then the NEXT button Figure 12 Manual Delivery Screen Step 3 The transaction has now started Open the fuel valves...

Страница 15: ...parts are used for product repair servicing Repairs are carried out by unauthorised personnel Any attempt is made to repair service a product deemed as non serviceable by Banlaw Products are subjected...

Страница 16: ...Controller Keep the Touch screen clean Avoid operating the Touch Screen with dirty fingers PPE and or clothing contaminated with fuel Keep the Advanced Controller cabinet clean and closed all the tim...

Страница 17: ...verride by switching on the override Circuit Breaker in the ResTrack Controller Control Box This power up the nozzle enable relays and allows refuelling Note security is compromised when the Controlle...

Страница 18: ...ng from pulse to Controller board Check Pulse drive mechanism and flow meter Pump may be cutting out due to restriction in flow or problem with pump circuit Check filters for obstruction Pump circuit...

Страница 19: ...To provide further assurance our products and services are backed by generous warranties The Banlaw ResTrack Controller is a fully serviceable product with a serial number and traceable build history...

Страница 20: ...LAW PRODUCT DATA SHEET RESTRACK ADVANCED CONTROLLER Doc ID PRH FMG 21 Version 1 0 Page 20 of 20 Please ensure you have the latest version of this document Liquid Asset Intelligence Website www banlaw...

Отзывы: