
BANLAW PRODUCT DATA SHEET
RESTRACK ADVANCED CONTROLLER
Doc ID: PRH-FMG-21 Version: 1.0
Page
14
of
20
Please ensure you have the latest version of this document.
Figure 11: Manual Delivery Screen
–
Step 2
Select the correct nozzle number then the “NEXT” button.
Figure 12: Manual Delivery Screen
–
Step 3
The transaction has now started. Open the fuel valves and turn the pumps on to complete the delivery. The
flow can be monitored on the Transaction Status screen
Figure 13: Manual Delivery Screen
–
Step 5