5.5.3 Installing the 5ACCFL00.0100-000 swivel-tilt flange
The following requirements must be met:
•
All connected cables must be disconnected.
•
The Automation Panel must no longer be installed on the swing arm system.
1. Disconnect the power supply cable to the Automation Panel (disconnect the power cable!). Disconnect from
all sources and poles!
2. Carry out electrostatic discharge at the ground connection.
3. Place the Automation Panel on a clean, flat surface.
4. Remove the Torx screws (T25) indicated in the following figure. Insert a flat-blade screwdriver into the slot
from the side and remove the cover. Avoid causing irreparable damage to the gasket.
Notice!
Before starting to install the swivel-tilt flange, move it to the zero position!
5. The link module must be removed before the swivel-tilt flange can be installed. To do so, perform the steps
provided in section
"Removing the link module" on page 147
in reverse order.
6. Check whether the sealing ring is inserted in the swivel-tilt flange. If the sealing ring is not installed in the
swivel-tilt flange, it must be inserted into the sealing recess.
7. Pass the cables that should be connected through the swing arm (in case this is also installed) and the
swivel-tilt flange.