Bandit
24
Copyright 8/19
MODEL SG-75
TRANSPORTATION PROCEDURES
LOADING & UNLOADING
BEFORE LOADING OR UNLOADING THE MACHINE, INSPECT AND CONFIRM THE FOLLOWING
STEPS:
When loading or unloading the self-propelled machine on the trailer, use care and caution. The
maneuvering of the equipment must be slow, smooth, and intentional, not fast and jerky.
WARNING
!
1.
Makesurethetrailerandtowingvehicleareparkedonaflatsurface.Theymustbestableonthe
surface with the brakes locked and/or the wheels chocked to avoid unwanted movement.
2. Position the loading ramps or loading gate securely between the trailer and the ground level. Have
them located so that they are in line with the tires or tracks of the machine when it moves.
3. Remove and store the chains and binders used for transporting.
4.
Confirmthattherearenotanyobstaclesonthetrailerbed,aroundthetrailerthatmaycauserestricted
movement of the machine or the operator.
5. The only person in the area should be the one that is operating the machine controls, and they should
be very experienced with the controls on this machine.
6. If you are on streets, roads or public areas, position the warning cones etc, per your company’s safety
policy.
7. Install the cutter wheel lock pin if not installed.
8. Check and make sure the frame lock pin is installed correctly. If the frame lock pin is not installed
correctly, start up the machine and raise or lower the frame until the frame lock holes line up and install
the frame lock pin.
9.
Loadorunloadthemachineonoroffthetrailer.
10. Follow the trailer manufacturer's recommendations for the amount of weight on the tongue or hitch
according to the total machine package weight to correctly position the machine on the trailer bed.
11. Align the machine with the trailer bed, and the loading ramps. The only equipment movement should
beslowly,straightonorstraightoffthetrailer.
12. With the engine and the machine at as low of speed as possible, move the machine toward the ramp
system. Make sure the alignment is correct throughout the travel and the cutter wheel clears obstacles
as it is going up or down the ramp system.
13. Properly secure the equipment and the area to avoid any possible accidents or dangers.
14.
Thetrailershouldbeconstructedwithappropriatechaindownpositionsforthespecificsizedmachine.
You must have binders that will withstand the strain of the machine trying to move while it is being
transported.
15. The loading ramps or loading gate of the trailer must be constructed to withstand the weight and forces
involved in loading and unloading the machine.
Содержание SG-75
Страница 7: ......
Страница 18: ...Bandit 16 Copyright 8 19 MODEL SG 75 CONTROLS MACHINE ORIENTATION REFERENCE RIGHT LEFT BACK FRONT...
Страница 21: ...Bandit 19 Copyright 8 19 MODEL SG 75 CONTROLS CONTROLS COMPONENTS 11 4 10 8 9 2 3 7 6 5...
Страница 28: ...Bandit 26 Copyright 8 19 MODEL SG 75 MAINTENANCE MACHINE ORIENTATION REFERENCE RIGHT LEFT BACK FRONT...
Страница 58: ...Bandit 56 Copyright 8 19 MODEL SG 75 HYDRAULIC DIAGRAM 16 9 17 1 2 13 15 12 3 6 8 7 5 4 3 8 11 11 7 10 14...
Страница 60: ...Bandit 58 Copyright 8 19 MODEL SG 75 DATE DESCRIPTION AMOUNT SERVICE RECORD SERVICE RECORD...