
4
Before Installation
Prior to installation verify the following:
The scale design will meet the customer’s application correctly
The scale is located so that vehicles can enter and exit easily
There will be sufficient drainage of water from the scale area
The approaches on both ends are level and meet the requirements of NIST
Handbook 44, requiring that the first 10’ is on the same plane of the platform
Do not locate electrical components near any items with magnetic material.
Additionally, do not locate indicators in direct sunlight or in areas subject to extreme
temperature changes as this may affect the accuracy of the weighing.
You have a copy of the scale and foundation drawings specific to this installation on
site at the time of installation
You have a copy of this manual on site at the time of installation
The foundation concrete has had a full twenty-eight day period for proper curing
All installation and calibration adjustments required for the scale to perform to its
specified accuracy and operation are considered to be part of the standard scale
installation.
Installations that cannot be finished in one session must ensure that proper signage
and barriers are in place to prevent use of the scale until fully operational
Содержание Centurion-DT
Страница 10: ......
Страница 11: ......
Страница 18: ...17 steel deck connection plates top view of concrete deck connection plates...
Страница 46: ...45...