21
Prior to installing the weighbridge module onto the dummy load cell stands ensure that
safety supports such as wood blocking is placed under the weighbridge module being
lifted.
Lift the 4-cell module over the four dummy cell stand assemblies and slowly lower the
module so that the button on top of each dummy stand is inserted into the thru hole
located in the module’s load cell nest. Hydraulic jacks can be also be used to help
position the modules onto the dummy stands.
Verify that all four dummy stands are inserted concentrically in the load cell nest thru
holes with no binding and that the bridge rests flat on top of the dummy cell pin.
DUMMY CELL BUTTON
LOAD CELL NEST
DUMMY CELL BUTTON
LOAD CELL NEST