ENGLISH
8
3.4.
Placing the entry pillar
STEP 1
Ensure that the gate is in
the closed position and
determine the position of
the entry post.
STEP
2
Mark the boreholes for the
foundation. Use the base
plate as a stencil for this
purpose. Open the gate
slightly. Remove the entry
pillar and make the boreholes
using an 18 mm drill bit.
STEP
3
1. Clean the
boreholes with a
brush.
Take care to
ensure that all
residues of dust and
dirt have been
removed.
2. Clean the
boreholes. Take care to ensure that all residues of dust and dirt
have been removed.
3. Insert resin capsules
STEP
4
Insert the threaded rods
with rotary movement
into the bore-hole. The
ends of the threaded rods
must project at least 60
mm over the foundation.
Allow the resin anchor to
cure in accordance with
the specification.
STEP
5
1. Lower the entry/catcher post
over the threaded bars.
2. Put washers and nuts in place
and tighten them by hand.
STEP
6
1. Close the gate such
that the roller rail lies
flush against the lower
edge of the bottom bar
(depends on the type of
gate).
2. Adjust the entry
height such that the
clearance between the
gate and the ramp is at least 5 mm. Improper adjustment en-hances
the risk of a fault caused by a very large force required for the gate
entry movement.
STEP
7
Adjust the level of the
entry portal with the
spirit level and check
that the pillar and gate
are in parallel.
STEP
8
Tighten all the nuts.
Содержание Extern 180
Страница 7: ...DEUTSCH 6 2 3 Die wichtigsten Bauteile 2 3 1 Manuell 2 3 2 Inline 2 3 3 Extern ...
Страница 25: ...DEUTSCH 24 Spezial Anleitung BALU ECO PRIMO GREEN PRIMO BLUE 9 ...
Страница 26: ...DEUTSCH 25 10 Spezial Anleitung BALU ECO PRIMO GREEN PRIMO BLUE ...
Страница 27: ...DEUTSCH 26 Spezialanleitung Colibri Schiebetormotor Extern 60 Deimos BT D Prox MA ...
Страница 29: ...DEUTSCH 28 Spezialanleitung Drehtormotor Colibri BALU ZLJ14 für CB 1 3 4 einflügelig ...
Страница 30: ...DEUTSCH 29 Spezialanleitung Drehtormotor Colibri BALU ZLJ24 für CB 1 3 4 zweiflügelig ...
Страница 31: ...DEUTSCH 30 Spezialanleitung Drehtormotor Colibri BALU ZA3 für CB 2 ...
Страница 32: ...DEUTSCH 31 ...
Страница 33: ...DEUTSCH 32 12 Spezialanleitung Schiebetormotor INLINE 160 400V Sheda Base ZT6 ...
Страница 34: ...DEUTSCH 33 ...
Страница 40: ...DEUTSCH 39 Notizen ...
Страница 41: ...ENGLISH Instructions for installation and use ...
Страница 46: ...ENGLISH 5 2 3 The most important components 2 3 1 Manual 2 3 2 Inline 2 3 3 Extern ...
Страница 64: ...ENGLISH 23 Special instructions BALU ECO PRIMO GREEN PRIMO BLUE 9 ...
Страница 65: ...ENGLISH 24 10 Special instructions BALU ECO PRIMO GREEN PRIMO BLUE ...
Страница 66: ...ENGLISH 25 Special instructions sliding gate motor Colibri Extern 60 Deimos BT D Prox MA ...
Страница 68: ...ENGLISH 27 Special instructions swing gate motor Colibri BALU ZLJ14 für CB 1 3 4 single leaf ...
Страница 69: ...ENGLISH 28 Special instructions swing gate motor Colibri BALU ZLJ24 für CB 1 3 4 two leaf ...
Страница 70: ...ENGLISH 29 Special instructions swing gate motor Colibri BALU ZA3 für CB 2 ...
Страница 71: ...ENGLISH 30 ...
Страница 72: ...ENGLISH 31 12 Special instructions sliding gate motor INLINE 160 400V Sheda Base ZT6 ...
Страница 73: ...ENGLISH 32 ...
Страница 79: ...ENGLISH 38 Notes ...
Страница 80: ...FRANÇAIS 1 Mode d installation et d emploi ...
Страница 85: ...FRANÇAIS 5 2 3 Die wichtigsten Bauteile 2 3 1 Manuell 2 3 2 Inline 2 3 3 Extern ...
Страница 103: ...FRANÇAIS 23 Instructions Spéciales BALU ECO PRIMO GREEN PRIMO BLUE 9 ...
Страница 104: ...FRANÇAIS 24 10 Instructions Spéciales BALU ECO PRIMO GREEN PRIMO ...
Страница 105: ...FRANÇAIS 25 Motor Colibri Extern 60 Deimos BT D Prox MA ...
Страница 107: ...FRANÇAIS 27 Motor Portail pivotant Colibri BALU ZLJ14 für CB 1 3 4 single leaf ...
Страница 108: ...FRANÇAIS 28 Motor Portail pivotant Colibri BALU ZLJ24 für CB 1 3 4 two leaf ...
Страница 109: ...FRANÇAIS 29 Portail pivotant Motor Colibri BALU ZA3 für CB 2 ...
Страница 110: ...FRANÇAIS 30 ...
Страница 111: ...FRANÇAIS 31 12 INLINE 160 400V Sheda Base ZT6 ...
Страница 112: ...FRANÇAIS 32 ...
Страница 118: ...FRANÇAIS 38 Notes ...
Страница 119: ...NEDERLANDS Montage en gebruiksaanwijzing ...
Страница 124: ...NEDERLANDS 5 2 3 De belangrijkste bouwdelen 2 3 1 Handmatig 2 3 2 Inline 2 3 3 Extern ...
Страница 142: ...NEDERLANDS 23 Speziale instructies PRIMO ECO PRIMO GREEN PRIMO BLUE 9 ...
Страница 143: ...NEDERLANDS 24 10 Speziale instructies PRIMO ECO PRIMO GREEN PRIMO BLUE ...
Страница 144: ...NEDERLANDS 25 Motor Colibri Extern 60 Deimos BT D Prox MA ...
Страница 146: ...NEDERLANDS 27 Motor draaipoort Colibri BALU ZLJ14 für CB 1 3 4 Enkele draaipoort ...
Страница 147: ...NEDERLANDS 28 Motor draaipoort Colibri BALU ZLJ24 für CB 1 3 4 Dubbele draaipoort ...
Страница 148: ...NEDERLANDS 29 Draaihek Motor Colibri BALU ZA3 für CB 2 ...
Страница 149: ...NEDERLANDS 30 ...
Страница 150: ...NEDERLANDS 31 12 INLINE 160 400V Sheda Base ZT6 ...
Страница 151: ...NEDERLANDS 32 ...
Страница 157: ...NEDERLANDS 38 Notes ...
Страница 158: ...ITALIANO Montaggio e use ...
Страница 163: ...ITALIANO 5 2 3 Componenti principali 2 3 1 Manuale 2 3 2 Inline 2 3 3 Externo ...
Страница 181: ...ITALIANO 23 Istruzioni speciali BALU ECO PRIMO GREEN PRIMO BLUE 9 ...
Страница 182: ...ITALIANO 24 10 Istruzioni speciali BALU ECO PRIMO GREEN PRIMO BLUE ...
Страница 183: ...ITALIANO 25 Motor Colibri Extern 60 Deimos BT D Prox MA ...
Страница 185: ...ITALIANO 27 Motor Cancelli a battente Colibri BALU ZLJ14 für CB 1 3 4 per singolo porte ...
Страница 186: ...ITALIANO 28 Motor Cancelli a battente Colibri BALU ZLJ24 für CB 1 3 4 per doppie porte ...
Страница 187: ...ITALIANO 29 Cancelli a battente Motor Colibri BALU ZA3 für CB 2 ...
Страница 188: ...ITALIANO 30 ...
Страница 189: ...ITALIANO 31 12 INLINE 160 400V Sheda Base ZT6 ...
Страница 190: ...ITALIANO 32 ...
Страница 196: ...ITALIANO 38 Notes ...
Страница 198: ...Notizen ...
Страница 199: ...Notizen ...
Страница 200: ...www b alu at ...