Installation Instructions & Owner’s Manual
SecuraLift® Rhino
11
04
Fig
Knockdown C-Rail Assembly
Step 1 (Knockdown C-Rail units only)
Unpack and assemble the C-Rail as shown (Fig 04).
To adjust the chain tension, move the shuttle to middle of track, then using a spring
scale measure the force required to pull the shuttle (The recommended pull force is
8kg (80N)). Adjust the 1/2” hex bolt to tension chain.
Screws
10
Screws
Turn tracks around
9
Tension 1/2” hex bolt
8
Swing and straighten
6
Slide sleeve
7
5
Swing
Slide sleeve
3
4
Cut cable tie
2
Swing and straighten
Start
Swing
1