- 64 -
5
Maintenance
5.1
Maintenance schedule
Before carrying out any maintenance activity, check that the start switch is in position O and that no electrical power is present on the terminals.
Maintenance schedule
Daily
50 hrs
after initial
start-up
Every 500
hours
Every 1000
hours
Every 2000
hours
Yearly
Service pak
-
2912 4412 05 or
2912 4546 05
*
-
-
For the most important subassemblies, Atlas Copco has developed service kits that combine all wear parts. These service kits offer you the benefits of genuine parts,
save on administration costs and are offered at reduced price, compared to the loose components. Refer to the parts list for more information on the contents of the
service kits.
Drain water from fuel filter
x
Check/Fill fuel level (3)
x
Empty air filter vacuator valves
x
Check air intake vacuum indicators
x
Check engine oil level (if necessary top up)
x
Check coolant level
x
Check control panel for alarms and warnings
x
Check on abnormal noise
x
Check function of coolant heater (option)
x
x
Replace air filter element (1)
x
x
Check/Replace safety cartridge
x
x
x
Change engine oil (2) (6)
x
x
x
Replace engine oil filter (2)
x
x
x
Replace fuel (primary)filter(s) (5)
x
x
x
!
Содержание QAS 60 Pd
Страница 1: ...QAS 60 Pd S2A APP Instruction Manual for AC Generators English...
Страница 2: ......
Страница 88: ...88 6 4 2 3 Solving alarms Menu flow Qc4002 Qc4002 Qc4002 OR Qc4002 G OK LOG SOLVE PROBLEM See page 86...
Страница 111: ...111 Circuit diagrams...
Страница 115: ...115...
Страница 119: ...119...
Страница 128: ...128...
Страница 132: ...132...
Страница 139: ...139...
Страница 141: ......
Страница 142: ...Printed in Belgium 04 2012 2954 6280 00 www atlascopco com...