4.4.4.6
Paralleling
Prior to starting parallel operation of two generators,
following connections need to be made:
– Connect the communication cable between the
generators by plugging the adapter into socket
X30.
– Connect the load with the generator.
Go via the site distribution panel (to be installed
by the customer) to connect the generator(s) with
the load. Always connect generator with the load,
and never directly with second generator.
When paralleling, make sure to
disable the Earth leakage relay by
putting switch S13 into off position.
QAS 1
QAS 2
Site distribution
panel
Load
CORRECT
QAS 1
QAS 2
Load
WRONG
!
Содержание QAS 60 Pd
Страница 1: ...QAS 60 Pd S2A APP Instruction Manual for AC Generators English...
Страница 2: ......
Страница 88: ...88 6 4 2 3 Solving alarms Menu flow Qc4002 Qc4002 Qc4002 OR Qc4002 G OK LOG SOLVE PROBLEM See page 86...
Страница 111: ...111 Circuit diagrams...
Страница 115: ...115...
Страница 119: ...119...
Страница 128: ...128...
Страница 132: ...132...
Страница 139: ...139...
Страница 141: ......
Страница 142: ...Printed in Belgium 04 2012 2954 6280 00 www atlascopco com...