- 40 -
Check fuel injectors (2)
x
Check engine protective devices
x
x
Inspect starter motor
x
Inspect turbocharger
x
x
Inspect water pump
x
x
Inspect charging alternator
x
x
Check that mast cable are not frayed or damaged. Replace
immediately if damaged.
x
Grease the mast collar
x
x
x
x
Inspection by Atlas Copco service technician
x
x
x
Generator sets in stand-by application have to be tested on a regular basis. At least once
a month the engine should run for one hour. If possible a high load (> 30%) should be
applied so that the engine reaches its operating temperature.
Maintenance schedule
Daily
100 hrs
after initial
start-up
Every 500
hours
Every 1000
hours
Every 2000
hours
Every 5000
hours
Yearly
!