87
The key-switch functions are:
•
(CENTRAL): Machine off - electrical system not powered
•
(RH POSITION): The whole electrical system of the platform starts, including
the mobile push-button panel in the work platform. The ground controls are
excluded.
•
(LH POSITION): The whole electrical system of the platform starts. The
ground controls are automatically enabled and the push-button panel in the
work platform is disabled.
Then the control unit will begin to check the safety systems:
•
On the console, the lights 1-2-3-4 will turn on, together with a beeping sound
•
The lights will flash
•
Once the check is complete and the machine is in the transport position and
levelled, only the lights 2-3 must stay on and the beeping must stop.
Once the check-control cycle has terminated, the engine can be started:
•
Turn selector no.5 to the right (OFF) holding it in place for 10 seconds (if
necessary); this will activate the glow plugs
•
After 10 seconds, you will hear a beep; at this point turn the selector to the
left (ON).
Содержание 1090 EVO
Страница 7: ...7...
Страница 10: ...10 Maximum transport height allowed manual levelling and the adjustment of the travel speed is allowed...
Страница 22: ...22...
Страница 23: ...23...
Страница 49: ...49 37 Combustion engine 38 Fuel tank 39 Bi levelling chassis 37 38...
Страница 78: ...78...
Страница 80: ...80...
Страница 122: ...122 In this configuration the oil level must be as shown in the figure below A 60mm...
Страница 144: ...144...
Страница 145: ...145...
Страница 146: ...146...
Страница 147: ...147...
Страница 148: ...148...
Страница 149: ...149...
Страница 150: ...150...
Страница 151: ...151...
Страница 152: ...152...
Страница 156: ...156 6 Using the nut supplied point A 7 Move the front wheel back by pressing on the track with your foot...
Страница 161: ...161 8 ATTACHMENTS 8 1 Declaration of conformity...
Страница 163: ...163 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Страница 177: ...177 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...