
82
4.1.5
Checking the fuel level
Before turning on the engine and/or starting a work shift, it is advisable to
check the fuel level.
The fuel level is visible in the ground control area (1).
There is also a reserve sensor (2). If the fuel level is too low, the machine will
emit an acoustic signal, the FUEL alarm will appear on the display and after 15
seconds the engine will turn off to avoid emptying the fuel system completely.
Top up the fuel by means of the dedicated filler cap (3).
o
The minimum recommended cetane number of the fuel is 45. It is
preferable to have a cetane number higher than 50, especially for
ambient temperatures below -20°C or for altitudes above 1500 mt.
•
The specific type of diesel fuel and sulphur content in % (ppm) must
comply with the applicable emission standards for the area in which the
engine is used.
•
It is strongly recommended to use fuel with a sulphur content below 0.1%
(1000 ppm).
•
Fuels with an EN590 or ASTM D975 specification are recommended.
•
For more information, consult the use and maintenance manual of the
engine.
Содержание 1090 EVO
Страница 7: ...7...
Страница 10: ...10 Maximum transport height allowed manual levelling and the adjustment of the travel speed is allowed...
Страница 22: ...22...
Страница 23: ...23...
Страница 49: ...49 37 Combustion engine 38 Fuel tank 39 Bi levelling chassis 37 38...
Страница 78: ...78...
Страница 80: ...80...
Страница 122: ...122 In this configuration the oil level must be as shown in the figure below A 60mm...
Страница 144: ...144...
Страница 145: ...145...
Страница 146: ...146...
Страница 147: ...147...
Страница 148: ...148...
Страница 149: ...149...
Страница 150: ...150...
Страница 151: ...151...
Страница 152: ...152...
Страница 156: ...156 6 Using the nut supplied point A 7 Move the front wheel back by pressing on the track with your foot...
Страница 161: ...161 8 ATTACHMENTS 8 1 Declaration of conformity...
Страница 163: ...163 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Страница 177: ...177 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...