
18
2
SAFETY INFORMATION
2.1
Notification of commissioning and routine inspections
The work equipment indicated in Annex VII to Legislative decree D.Lgs 81/2008
and successive amendments must be subjected to REGISTRATION and ROUTINE
INSPECTIONS by the competent authorities, i.e. INAIL, the National Institute for
Insurance Against Industrial Accidents (former ISPESL, Higher Institute for
Prevention in the Workplace), the Local Health Authority and other public and
private bodies established by the criteria laid down in Ministerial decree DM
11/04/2011.
•
The User or Employer must notify Commissioning to the territorially
competent National Institute for Insurance Against Industrial Accidents
(INAIL) for the purpose of registering the platform.
•
Once the platform has been registered, ROUTINE INSPECTIONS must begin.
The FIRST of these is performed by INAIL within 45 days (since 21 August
2013) from the date on which the platform is put into service.
•
The successive inspections, to be carried out at the frequency indicated in
Annex VII to Legislative Decree D.Lgs 81/2008, are carried out by the Local
Health Departments (ASL) or, when permitted by the regional laws, by ARPA
(Regional Agency for the Protection of the Environment) or by Public or
Private undertakings, as freely decided by the Employer or User and in
accordance with the established formalities.
Attached are a few EXAMPLES of "notice of commissioning" and "routine
inspections". Users should check them each time in the www.inail.it portal,
according to the installation site in question.
Содержание 1090 EVO
Страница 7: ...7...
Страница 10: ...10 Maximum transport height allowed manual levelling and the adjustment of the travel speed is allowed...
Страница 22: ...22...
Страница 23: ...23...
Страница 49: ...49 37 Combustion engine 38 Fuel tank 39 Bi levelling chassis 37 38...
Страница 78: ...78...
Страница 80: ...80...
Страница 122: ...122 In this configuration the oil level must be as shown in the figure below A 60mm...
Страница 144: ...144...
Страница 145: ...145...
Страница 146: ...146...
Страница 147: ...147...
Страница 148: ...148...
Страница 149: ...149...
Страница 150: ...150...
Страница 151: ...151...
Страница 152: ...152...
Страница 156: ...156 6 Using the nut supplied point A 7 Move the front wheel back by pressing on the track with your foot...
Страница 161: ...161 8 ATTACHMENTS 8 1 Declaration of conformity...
Страница 163: ...163 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Страница 177: ...177 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...