ARRIMOTION User’s Guide, 01/2004
Page 154 of 162
Wiring the dolly to the ACB
The dolly should be connected to the leftmost ACB-1 on the main controller in the following way.
K-ACBCAN-PANTHER
K-ACB-LIFT
K-ACB-DRIVE
K-PANTHER-PB
K-PB-POT
Laying the track and installing the dolly on the track
The Track must be perfectly leveled and in good condition. The surface underneath the track must be
rigid enough to accept the load of the dolly without any movement.
After placing the dolly on the track attach the two end pieces for the timing belt to the track ends. Do not
mount the belt yet.
Place the dolly in such a position that the drive motor can be adjusted to about 2mm of clearance above
the sleeper. The drive motor can be lowered by pushing it down and after adjustment the four screws
should be tightened.
2mm clearance
Содержание ARRIMOTION
Страница 2: ...ARRIMOTION User s Guide 01 2004 Page 2 of 162 This page has been intentionally left blank ...
Страница 5: ...ARRIMOTION User s Guide 01 2004 Page 5 of 162 ...
Страница 6: ...ARRIMOTION User s Guide 01 2004 Page 6 of 162 This page has been intentionally left blank ...
Страница 12: ...ARRIMOTION User s Guide 01 2004 Page 12 of 162 1 Introduction ...
Страница 21: ...ARRIMOTION User s Guide 01 2004 Page 21 of 162 This page has been intentionally left blank ...
Страница 22: ...ARRIMOTION User s Guide 01 2004 Page 22 of 162 2 Setup ...
Страница 37: ...ARRIMOTION User s Guide 01 2004 Page 37 of 162 3 Operation ...
Страница 57: ...ARRIMOTION User s Guide 01 2004 Page 57 of 162 ...
Страница 79: ...ARRIMOTION User s Guide 01 2004 Page 79 of 162 ...
Страница 80: ...ARRIMOTION User s Guide 01 2004 Page 80 of 162 4 Software Reference ...
Страница 120: ...ARRIMOTION User s Guide 01 2004 Page 120 of 162 5 Hardware Reference ...