PiCUS TMSO Manual
56
7.6.5 Transfer of Project Data and Configuration
In the
SET
tab click on the
SET
button. You can
then watch how the app transfers the project data
and the configuration you entered to the TMSO.CU.
7.6.6 System Test
As a last step before the system can be activated,
the system test in the TMSO.CU must be carried
out. It will try to connect to the registered TMSO.IM,
test the quality of the connection, configure the
sensors and query their status. Furthermore the
Internet connection and access to the cloud are
checked.
The test is started by clicking on the
PREPARE
button in the
MGT
tab of the management window.
The whole process then runs automatically and can
take up to 5 minutes, depending on the quality of
the radio connections. The BLE connection
between the central unit and the mobile phone is
disconnected for some time but is automatically
restored after the test is completed.
As long as the test is running, the
MEAS-LED
will
light up permanently, after completion it will be
switched off again.
NOTE!
In some cases the app may not be able to
automatically re-establish the BLE connection (as
soon as the test is completed and the
MEAS LED
is off again). In this case, briefly switch the
Bluetooth of your mobile phone off and on again
and then click on the round symbol with the two
arrows in the top right corner. The app will then
reconnect and retrieve the test result.