CHAPTER 2
INSTALLATION
Entire Contents Copyright
2014 by Adaptive Power Systems, Inc. (APS) • All Rights Reserved • No reproduction without written authorization from APS.
44M04 LOAD MAINFRAME OPERATIONS MANUAL
Page 17 of 93
44M00
CAUTION
BEFORE you clean the unit, switch the mains power off and
disconnect the input line cord.
・
Please do NOT use any organic solvent capable of changing the
nature of the plastic such as benzene or acetone.
・
Please ensure that no liquid is allowed to penetrate this product.
2.8
Powering Up
The following procedure should be followed before applying mains power:
1.
Check that the POWER switch is in the off (O) position.
2.
Verify that the rear panel voltage selector of the 44M04 mainframe is correctly set.
3.
Check that nothing is connected to any of the DC INPUT (load input terminals) on the
front and/or rear panels.
4.
Connect the correct AC mains line cord to the 44M04 AC input terminal.
5.
Plug the line cord plug into a suitable AC outlet socket.
6.
Turn on (I) the POWER switch.