![AmeriGlide STRATOS VPL Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/ameriglide/stratos-vpl/stratos-vpl_installation-and-service-manual_2930295025.webp)
STRATOS WITH ENCLOSURE:
Install Manual
25MAR2022 | 630-00147 C
25
INSTALLATION
STRATOS WITH ENCLOSURE: SECTION 4
OPERATIONAL CHECK
Upon installation and at scheduled intervals the
operation of the VPL must be verified.
NOTE: ASME A18.1-2017 requires that when the lift is
installed in commercial applications, operation checks
are to be conducted not less than weekly by authorized
personnel.
Apply power and verify all four (4) LED
indicator lights are solid green.
Paddle/buttons on cab controls control UP
and DOWN travel.
E-Stop PRESSED IN stops and prevents travel
of platform. Button illuminates and alarm
sounds (if equipped). Indicator lights 1, 2, 3
and four (4) are solid RED.
Key switch (if equipped) OFF stops and
prevents travel.
Landing switches stop the platform at each
landing within 1/2", does not coast, and
opens the gate locks.
Automatic Door Openers (if equipped) open
the doors/gates at landing.
Open doors/gates prevent any travel of the
platform. Indicator lights three (3) and four
(4) are solid RED.
Call Station buttons control UP and DOWN
travel.
Key switch (if equipped) OFF on Call Stations
stops and prevents travel from Call Station.
If equipped - safety pan switches depressed
prevent DOWN travel and allow UP travel
(check several locations). Indicator lights one
(1) and (2) are flashing AMBER.
Pit switch (if equipped) prevents UP and
DOWN travel. Indicator lights 1, 2, and 3 are
solid RED.
Verify that the ventilation system/lighting is
functional and charging.
PERMANENT POWER
INSTALLATION
Permanent power can be installed at various points
in the overall installation process; however, it must
be installed by a qualified electrical contractor in
compliance with local codes and regulations. The
VPL must be wired to a dedicated circuit, connected
through a 2-pole fused and lockable disconnect,
providing a 120V AC power supply (15 Amp breaker).
The fuses should be a minimum of 15A.
See Figure 4-22.
OUTSIDE TOWER
CONDUIT
DPST FUSED DISCONNECT
G
G
N
L
S/L
INSIDE TOWER
JUNCTION BOX
5X WIRE NUTS
Figure 4-22
Route wiring from disconnect to tower as directly
as possible and enter the tower through most
convenient knock-out in the tower side panels.
Inside the tower enclosure, route wires from
knockout to internal junction box along the back
panel of the enclosure. Use the backside of the wire
channel if the junction box is at a different level
than knockout. Be sure all wiring is routed clear of
the moving carriage and roller wheels inside the
tower. See Figure 4-23.
Содержание STRATOS VPL
Страница 1: ...25MAR2022 630 00147 C VERTICAL PLATFORM LIFT WITH ENCLOSURE STRATOS INSTALLATION SERVICE MANUAL ...
Страница 2: ......
Страница 44: ...866 378 6648 ameriglide com ...