STRATOS WITH ENCLOSURE:
Install Manual
25MAR2022 | 630-00147 C
24
INSTALLATION
STRATOS WITH ENCLOSURE: SECTION 4
INSTALLATION TOWER
CHECK
Before reinstalling the top cap and front panels,
an operational check should be completed on the
internal tower safety features.
Apply temporary power and verify all four (4)
LED indicator lights on the control board are
solid green.
Manually depress the final limit switch (the
highest positioned switch) and verify any
travel of platform is prevented and indicator
lights 1, 2, and 3 are flashing RED.
Manually depress the safety nut switch (the
switch near ACME nut) and verify any travel
of platform is prevented and indicator lights
1, 2, 3, and 4 are flashing RED.
Manually depress the Over-Speed Governor
(OSG) switch (the switch at the bottom
of ACME screw) and verify any travel of
platform is prevented and indicator lights 1,
2, and 3 are solid RED.
If equipped, lift the float of the float switch
(the switch at the bottom of the tower) and
verify that DOWN travel is prevented and
indicator light two (2) is flashing AMBER.
Verify that the ACME drive screw is
lubricated.
Verify that the shipping bolt was removed
from the cable tensioning pulley and that the
pulley is hanging in the tower without hitting
any obstacles during platform travel.
Verify that the manual lowering wrench and
socket are located in a secure place outside
the lift.
Verify that the E-Stop is functional and
all 4-LED lights are solid red with no lift
movement.
Verify the screws securing the tower skins
have a plastic washer and are tight.
Reset the board
❑
Enter service mode by pressing and
releasing the service button
❑
Press and hold down the service
button again for 3-seconds.
❑
Press and release the reset button.
FINAL INSTALLATION
Completing the above steps will clear any errors
from the board.
1. Install the front panel between the platform
and tower. Slots in the bottom of the front
panel should rest on the pins in the tower.
Install five (5) ¼"-20 screws and plastic washers
at the top front panel leaving the top three (3)
screws loose and ¼" offset from the panel.
2. Disconnect the power to the lift. Connect
the cable in the top cap for status indicator
lights into the control board. Slide the top
cap over the top of the tower aligning the top
cap slots with the four (4) side screws and
three (3) front screws. There are tabs in the
back of the top cap that drop into slots in the
tower top plate. These tabs must drop into the
slots for the top cap to sit down on all seven
(7) screws. Tighten seven (7) ¼"-20 screws
securely against the top cap. Reconnect the
power to the lift.
3. If the unit is outside, Ameriglide recommends
(weatherizing) the Stratos with enclosure unit.
This will consist of caulking silicone between
the enclosure panels. This will prevent ice/
water from penetrating the area between the
panels to help prevent rusting.