STRATOS WITH ENCLOSURE:
Install Manual
25MAR2022 | 630-00147 C
23
INSTALLATION
STRATOS WITH ENCLOSURE: SECTION 4
FINAL POSITIONING AND
ANCHORING
79
"
of overhead clearance is required above the
platform floor when the lift is at the upper landing.
Position the lift in its final location.
Verify that the tower front and sides are plumb and
all running clearances are the proper dimensions.
Shim if necessary. Wood shims must never be used.
Install two (2) anchors at the back of the tower and
two (2) anchors into the tower legs. See figure 4-20.
Anchor
Figure 4-20
1. 8' models must have the lift tower anchored
into a solid surface at or above the top cross-
brace of the tower frame. 10' or taller models
must have the lift tower anchored at two (2)
levels into a solid surface at or above the top
two (2) tower cross braces. This is to ensure
running clearances remain constant. There
are two (2) spacers included in the small parts
kit that go between the cross brace and back
panel to provide a more secure connection to
wall. There are two options for anchoring the
top of the tower. See Figure 4-21.
Anchor
Anchor
8'
10'
12'
14'
Anchor
Anchor
Figure 4-21
The first option is to use the optional tower brace
that attaches to the sides of the tower. Some
brackets attach to a structure. Then the brackets are
fastened together.
Locate the tower brace as high as possible on the
tower.
NOTICE
The second option for anchoring the lift is drilling
through the slots in the back of the tower cross-
braces at the desired locations and anchor to the
structure behind the lift. The wall needs a brace or a
solid structure behind it. Anchors should be built out
at least 1
"
from the center 15
"
of the tower back so
that top can be removed for service. Insert supplied
spacers behind tower cross braces when anchoring.
INSTALLING FIXED RAMPS
1. Position ramp 3/8" to 3/4" from the platform
door frame at the lower landing.
2. Anchor the ramp to the concrete pad.