24
The only electrical input connections to the dryer are the 3-phase (3ø) power leads (L1, L2, L3, and
sometimes neutral) and ground. Single-phase (1ø) power for the control circuit is done internally to
the dryer. No single-phase (1ø) input connection is required on a 3-phase (3ø) dryer.
For gas and steam dryers manufactured for operation at 3-phase (3ø), the electrical connections
are made at the power distribution block located in the service box at the rear, upper left corner of
the dryer. The ground connection is made to the copper lug also provided in this box. To gain
access to the service box contactor, the service box cover
must be
removed.
Содержание ML-75DIII
Страница 22: ...18 ...
Страница 65: ...ADC113343 1 09 26 01 25 ...