Cleaning the implement after operation
200
Pantera 4504 CP plus BAG0230.2 07.21
13.7
Cleaning the sprayer with a full tank (work interruption)
1. Control terminal: Flush the boom while driv-
ing on the field.
Mark the application of spray liquid.
>
Start flushing the boom.
X
Stop flushing the boom.
2. TwinTerminal: Clean the suction filter, see
section on cleaning the suction filter.
3. Interrupt the pump drive.
Without nozzle control:
Flush the boom and apply at least 50 litres of
flushing water while driving on an untreated area.
With nozzle control:
Only flush the boom with 50 litres of water, and
then flush the nozzles and apply the flushing
water on an untreated area.
The spray liquid tank and agitators are not
cleaned!
Continuing the spraying operation
1. Run the pump.
2. Control terminal:
switch on maximum
agitation for at least 5 minutes.
13.8
External cleaning
1. Run the pumps.
2. TwinTerminal:
start / stop the
external cleaning.
3. Clean the field sprayer and the sprayer
boom with the spray gun.
Содержание Pantera 4504
Страница 2: ...2 Pantera 4504 CP plus BAG0230 2 07 21 Leipzig Plagwitz 1872 ...
Страница 20: ...General Safety Instructions 20 Pantera 4504 CP plus BAG0230 2 07 21 ...
Страница 259: ...Diagrams and overviews Pantera 4504 CP plus BAG0230 2 07 21 259 16 1 Liquid circuit part width section control ...
Страница 263: ...Diagrams and overviews Pantera 4504 CP plus BAG0230 2 07 21 263 ...
Страница 267: ...Diagrams and overviews Pantera 4504 CP plus BAG0230 2 07 21 267 16 4 2 238BFuses and relay in the cabin roof ...
Страница 277: ...Spray table Pantera BAG0230 2 07 21 277 ...
Страница 286: ......